A worked example, with illustrative figures
One service business, one sensible-looking price change, and the three places it lands that the first spreadsheet never showed.
The decision as first framed
Today: 20 jobs a month at 1,000 each, costing 700 to deliver. Contribution before overheads: 6,000 a month.
6,000Today, per month
The proposal: a premium package at 1,200. The extra work it includes raises delivery cost to 850 a job.
+200 price+150 delivery cost
The first spreadsheet stops here: 350 contribution a job instead of 300. It looks like a yes.
350 a jobWas 300
First consequence: economics
Whether buyers accept 1,200 is an untested belief, and the whole case rests on it.
Second consequence: operations
The extra work takes delivery from 10 hours a job to 13. Capacity available: 220 hours a month, against 200 used today.
220 hAvailable
At 20 premium jobs: 260 hours. The attractive case is the one the business cannot deliver without a change.
260 h40 over
At 16 jobs: 208 hours. It fits, and it earns less than today.
208 hFits, earns 5,600
What is known and what is assumed
A build-sized commitment on level-one claims is blocked. The rung below is an experiment, which needs a named test, not a level.
The useful output